I preordered on 8/2 and after missing the 8/26 release date my set was supposed to ship 9/10. Reached out today and the new ship date is “mid to late October” I’ll be surprised if they see the course in 2021.
For reference my order was:
T200 3 iron “utility build” with Ad Di 105x
T100 4-pw with DG TI X100
all with Tour Velvet Ribbed.
Did anyone else order a set? What’s the status?